Former Sinclair Horticulture Site – Lincoln

HCD Ltd were appointed as the Principal Contractor to undertake the six week project.

Works consisted of waste removal, the demolition of a large steel framed shed, smaller perimeter buildings and the disposal of Portakabins.

A large quantity of foundations were dug out before being crushed into 1086m³ of 6F2 re-usable specification material which was subsequently used to level the site.

Client

Lincoln Western Limited

Location

Beevor Street, Lincoln

Year

2017