The £320K project on a 8.5 acre site was carried out over a 14 week period.

It involved the removal of Asbestos & the decommissioning of fuel tanks along with other hazardous waste.

Multiple buildings, which included 4.8K tonnes of scraps metals, were demolished & included basements down to 3m below slab level.

The removed brick & concrete arisings were crushed into stockpiles of 11K tonnes of reusable material.

This project was commissioned to facilitate the building of a Tesco Supermarket.

Client

Longcross Construction Ltd