Droylsden

This 50 week, £1.5m project involved the removal of Asbestos & the decommissioning of fuel tanks as well as electric sub-stations.

Also included was the removal of hazardous waste, the demolition of multiple buildings down to 1m below slab level & the removal of over 5.4K tonnes of scrap metals.

2.4K tonnes of crushed brick and concrete were stockpiled on the 22 acre site for client re-use.

Client

Bovale Ltd

Location

Manchester